Nuraply 3PM new house

Main Roof

No 10 Adhesive
Nurabase
Nuraply 3PM Slate
Nuratrim
Nuravents
Basically a big plywood rectangle. It can’t really be seen in the photos but the design of the roof diaphram is such that the roof surface twists from a high point in the north west corner to a low point in the south east corner.
hover cursor over image for text, click on them for larger version
large clear area, plywood substrate this angle shows the slope large sump at lower corner of roof closer view of sump application of No10 adhesive by roller applying the No 10 adhesive (primer) the first roll of Nurabase is laid out to lay, another roll laid out to relax about half way with the Nurabase about to torch another roll very windy, looking towards Newtown Nurabase underlay complete reverse view of previous image while waiting for the 3PM cap sheet to arrive install edge trim brackets Nuratrim edge bracket, north side Nuratrim edge bracket, west side closer view of Nuratrim bracket sump lined with 3PM Slate cap sheet on with the 3PM Slate about half way with the 3PM Slate view of the lower part of the roof with 3PM Slate looking up slope, about half way round skylight kerb installed Nurabase to sides of skylight kerb underlay completed to skylight and 3PM Slate brought in to it 3PM Slate dressed around skylight 3PM Slate carried on past skylight near the top edge with 3PM Slate skylight is flashed and glazed roof top breather vents are installed edge pieces are tucked into Nuratrim, south edge reverse view of previous image edge pieces are tucked into Nuratrim, west edge view of sump and edge pieces a diverter is added above sump, waterflow was too fast and spilled over the edge another view of roof top breather vents ready for target patches edge trim on outside, south side same location, with cedar barge added edge trim on outside, west side wood plinths for Soalr Panels being flashed in completed plinths completed, looking from centre to southeast corner (lower corner) completed, looking from north west (higher corner) to southeast corner completed, looking from north east (higher corner) to south end

Lower Deck

Ardex Dove Grey Butynol 1.5mm rubber.
This deck was then overlaid with a timber deck on joists on pads.
hover cursor over image for text, click on them for larger version
lower deck to be covered in Butynol 1.5mm Dove Grey plywood joints taped up with silicone tape ready to lay, looking outwards plywood joints taped up with silicone tape ready to lay, looking inwards second sheet glued up and tacking off second sheet laid down, looking inwards second sheet laid down, looking outwards lower deck completed, looking outwards lower deck completed, looking inwards feature cedar wall above Butynol deck one of two dormer windows below deck one piece fit on dormer window roof view of edge turndown on dormer window roof

text for images
large clear area, plywood substrate
this angle shows the slope
large sump at lower corner of roof
closer view of sump
application of No10 adhesive by roller
applying the No 10 adhesive (primer)
the first roll of Nurabase is laid out to lay, another roll laid out to relax
about half way with the Nurabase
about to torch another roll
very windy, looking towards Newtown
Nurabase underlay complete
reverse view of previous image
while waiting for the 3PM cap sheet to arrive install edge trim brackets
Nuratrim edge bracket, north side
Nuratrim edge bracket, west side
closer view of Nuratrim bracket
sump lined with 3PM Slate cap sheet
on with the 3PM Slate
about half way with the 3PM Slate
view of the lower part of the roof with 3PM Slate
looking up slope, about half way
round skylight kerb installed
Nurabase to sides of skylight kerb
underlay completed to skylight and 3PM Slate brought in to it
3PM Slate dressed around skylight
3PM Slate carried on past skylight
near the top edge with 3PM Slate
skylight is flashed and glazed
roof top breather vents are installed
edge pieces are tucked into Nuratrim, south edge
reverse view of previous image
edge pieces are tucked into Nuratrim, west edge
view of sump and edge pieces
a diverter is added above sump, waterflow was too fast and spilled over the edge
another view of roof top breather vents ready for target patches
edge trim on outside, south side
same location, with cedar barge added
edge trim on outside, west side
wood plinths for Soalr Panels being flashed in
completed plinths
completed, looking from centre to southeast corner (lower corner)
completed, looking from north west (higher corner) to southeast corner
completed, looking from north east (higher corner) to south end
lower deck to be covered in Butynol 1.5mm Dove Grey
plywood joints taped up with silicone tape ready to lay, looking outwards
plywood joints taped up with silicone tape ready to lay, looking inwards
second sheet glued up and tacking off
second sheet laid down, looking inwards
second sheet laid down, looking outwards
lower deck completed, looking outwards
lower deck completed, looking inwards
feature cedar wall above Butynol deck
one of two dormer windows below deck
one piece fit on dormer window roof
view of edge turndown on dormer window roof