Easygum over Sonogard PU

hover cursor over image for text, click image for larger version (600×450 pixels)
one of three lower decks, pavers over Sonogard PU membrane pavers lifted Xplus degreaser wash cleaned ready for coating stacked pavers, reverse view from previous image low view of plaster pads view out to deck from inside fibreglass and Easygum lamination fibreglass and Easygum lamination lamination part complete Easygum Paste Easygum mixed close up at deck level 3rd coat Easygum 3rd coat Easygum, closer view 3rd coat Easygum, overview, complete reinstalling pavers on spacer rings other half of pavers lifted and wash down view down on deck from level above drain in corner fibreglass being embedded in Easygum drain corner laminated view down onto deck, 2nd half completed view down onto deck, pavers reinstalled pavers reinstalled 2nd deck pavers removed and deck washed down plaster pads are loweron this deck pavers and pots stacked on other half starting the lamination laminating the upstands first first half laminated 2nd half is quite dirty wash down with Xplus degreaser wash down with Xplus degreaser on this deck the Sonogard is bubbled and lifting off removing the Sonogard by scraping part of the area of blistering removed and cleaned view from above shows area removed embedding fibreglass in Easygum lamination completed some plaster pads fell off during cleaning and scraping off the Sonogard, reinstated on EPDM rubber pads pavers reinstalled on plaster pads and spacer rings 2nd deck complete 3rd lower deck cleaned ready for Easygum system reverse view, lots of pot plants packed at one end this deck also has severe bubbling and delamination of the Sonogard close up of the bubbling laminating again 2nd half of deck with pavers removed 2nd half of deck with pavers removed cleaned up a bit severe bubbling severe bubbling severe bubbling severe bubbling severe bubbling severe bubbling severe bubbling removed the plaster pads and ripped all the Sonogard off ripped all the Sonogard off washed with degreaser/cleaner, waterblasted clean washed with degreaser/cleaner, waterblasted clean wall corner, gutter junction sealant has split sealant racked out and surfaces cleaned new PU sealant is applied to junction several days later, ready to coat upstands laminated with fibreglass and Easygum first strip of horizontal being laminated more laminating thats the fibreglassing done no room for pavers outside, so stacked in the hallway view of that deck from above rain came in 4hrs later, no washout just minor surface discolouring from underfloor downpipe discharging ready to apply final coat final coat completed reinstalling pavers on spacer rings pads have rubber cushion underneath reinstalling pavers on spacer rings finished, waterblasted clean finished, waterblasted clean

one of the upper level decks being cleaned, steel matt walking surface steel mat sifted and Sonogard cleaned with Xplus the issue on this deck is the small nib around the edges, here being laminated in Easygum and fibreglass half of deck in laminated with Easygum and fibreglass ready to apply 3rd coat of Easygum that nib is now solid upper level deck 2nd part heavy first coat of Easygum fibreglass and Easygum lamination lamination completed 7 days later, final coat of Easygum metal grill floor reinstated, edge flashing painted metal grill floor reinstated, edge flashing painted view from outside fence, of new flashing finish
another job, ledge on side of building, harness work patch on metal ledge flashing, taken from window

Advertisements