TPO Deck

This deck on an older house in Karori was previously covered in Butynol rubber membrane and was leaking. The builder dismantled the deck and rebuilt and resloped the framing to take new plywood substrate. We installed Viking Enviroclad TPO membrane (Carlile TPO). A floating timber deck was built over the TPO membrane.

hover cursor over image for text, click image for larger version (600×450 pixels)

The House rebuilt framing, 18mm H3 plywood substrate flashing soaker, TPO installing the TPO coated metal drip edge plywood fixings, stainless steel laying the first sheet in adhesive source (Carlile) second sheet being installed tapered two ways welded cross lap upstands are done in seperate pieces 50mm welded lap onto deck sheet another view of deck and upstands end of upstand, kerb, post pre-formed corner patch custom internal corners, welded second part of deck screw spacing 150mm first sheet being adhered second sheet being installed view back down to central level from north tower pre-formed corners to door cavity door frame installed over membrane another view of door frame installed over membrane kerb end being detailed kerb end, post partially completed detail around kerb/wall intersection post base target flange bottom weather board being reinstalled weatherboards installed end of other deck weatherboards reinstalled post collar and flange welded up, top edge bedded in cutoff mastic post collar clamped with termination bar in PU sealant framing for timber deck and timber post skirtings installed posts skirted and timber deck laid

text for images
The House
rebuilt framing, 18mm H3 plywood substrate
flashing soaker, TPO
installing the TPO coated metal drip edge
plywood fixings, stainless steel
laying the first sheet in adhesive
source (Carlile)
second sheet being installed
tapered two ways
welded cross lap
upstands are done in seperate pieces 50mm welded lap onto deck sheet
another view of deck and upstands
end of upstand, kerb, post
pre-formed corner patch
custom internal corners, welded
second part of deck
screw spacing 150mm
first sheet being adhered
second sheet being installed
view back down to central level from north tower
pre-formed corners to door cavity
door frame installed over membrane
another view of door frame installed over membrane
kerb end being detailed
kerb end, post partially completed
detail around kerb/wall intersection
post base target flange
bottom weather board being reinstalled
weatherboards installed
end of other deck weatherboards reinstalled
post collar and flange welded up, top edge bedded in cutoff mastic
post collar clamped with termination bar in PU sealant
framing for timber deck and timber post skirtings installed
posts skirted and timber deck laid