LIG relining

Re-glue loose upstands with WA98 adhesive.
Wash the existing rubber with XPlus degreaser to remove dirt, moss and surface carbonization and then rinse clean.
Allow to dry.
Prime the cleaned and dry surface with Ardex Butynol WPM222 Primer and allow to dry.
Remove two rows of screws from the metal roof to allow propping up and fitting of new rubber under.
Install new 1.5mm Black Butynol Rubber to full girth of gutter in WA98 Adhesive and dress under the metal roof 100mm.
Refit screws to metal roof.
Replace 184 perished skylight fixings.

hover curser over image for text, click on image for full size (opens in new tab)

Large Internal Gutter (LIG) view to north Large Internal Gutter (LIG) view to south overal girth is 1100mm or 3.6ft some of the rubber lining upstands are not high enough there are 4 box sumps or 4 rubbish traps it doesn't take much to block them up at the high point of the gutter slopes, there are 8 sections or slope angles the existing rubber is washed with Xplus degreaser closer view of the degreaser at work the whole gutter is washed, then hosed off after the cleaning work view along the gutter, overflow pipe sticking up the box sumps are relined new lining to sump the first gutter section is primed with WPM222 first section sheet is in position glued up with WA98 adhesive other side is glued up, you can see there is a good slope closer view note low height of old rubber here on metal side the first sheet is glued in and tucked up as far as it will go on the upstand each side screws are removed from the metal roof to be able to tuck the rubber membrane under close in view after the new membrane is tucked under the metal roofing first section is complete with new lining second section laid out relaxing second section folded in half and glued second section, right side tucked under roofing third section, near north end, half folded and glued third section near north end opposite folded same fold opposite view 3 sections complete, 63% done, by length another shorter section glued up and tacking off glued up and tacking off same section completed stop end with overflow cut out finished with detail tape typical completed box sump relined, plastic insert clamp 3 new galvanized bird cage leaf guards fitted north end sump cleaned out, silicone repair done at some stage new internal collar, seam tape and detail tape to outlet finished outlet new bird cage leaf guard and dressing around a/c unit overflow pipe last section, old rubber hardly up the sides hole in this section, silicone fell off longest run, 8.3 metres, rlaxing before installation glued up and tacking off glued up and tacking off, other half 32 screws backed out to tuck rubber under metal roofing last section completed, new collar around overflow work at end of gutter requires the wearing of a harness and fall restraint rope, attached to this temporary fall arrest anchorage bracket the old rubber is loose here old rubber reglued to metal lining new rubber completed stop end dressed over wall nib the neoprene washers are perished on the skylight plastic sheeting and will be replaced the screws have wings for cutting through the plastic sheet, cannot be used with new metal and rubber washer new metal washer and rubber seal, and new screw example of new screw and washer in place bucket of 140 new screws/washers/seals two rows of screws are replaced 10 skylight runs have new screws and washers

Text for images.
Large Internal Gutter (LIG) view to north
Large Internal Gutter (LIG) view to south
overal girth is 1100mm or 3.6ft
some of the rubber lining upstands are not high enough
there are 4 box sumps
or 4 rubbish traps
it doesn’t take much to block them up
at the high point of the gutter slopes, there are 8 sections or slope angles
the existing rubber is washed with Xplus degreaser
closer view of the degreaser at work
the whole gutter is washed, then hosed off
after the cleaning work
view along the gutter, overflow pipe sticking up
the box sumps are relined
new lining to sump
the first gutter section is primed with WPM222
first section butynol sheet is in position glued up with WA98 adhesive
other side is glued up, you can see there is a good slope
closer view
note low height of old rubber here on metal side
the first sheet is glued in and tucked up as far as it will go on the upstand each side
screws are removed from the metal roof to be able to tuck the rubber membrane under
close in view after the new membrane is tucked under the metal roofing
first section is complete with new butynol lining
second section laid out relaxing
second section folded in half and glued
second section, right side tucked under roofing
third section, near north end, half folded and glued
third section near north end opposite folded
same fold opposite view
3 sections complete, 63% done, by length
another shorter section
glued up and tacking off
glued up and tacking off
same section completed
stop end with overflow cut out finished with detail tape
typical completed box sump relined, plastic insert clamp
3 new galvanized bird cage leaf guards fitted
north end sump cleaned out, silicone repair done at some stage
new internal collar, seam tape and detail tape to outlet
finished outlet
new bird cage leaf guard and dressing around a/c unit overflow pipe
last section, old rubber hardly up the sides
hole in this section, silicone fell off
longest run, 8.3 metres, rlaxing before installation
glued up and tacking off
glued up and tacking off, other half
32 screws backed out to tuck rubber under metal roofing
last section completed, new collar around overflow
work at end of gutter requires the wearing of a harness and fall restraint rope, attached to this temporary fall arrest anchorage bracket
the old rubber is loose here
old rubber reglued to metal lining
new rubber completed stop end dressed over wall nib
the neoprene washers are perished on the skylight plastic sheeting and will be replaced
the screws have wings for cutting through the plastic sheet, cannot be used with new metal and rubber washer
new metal washer and rubber seal, and new screw
example of new screw and washer in place
bucket of 140 new screws/washers/seals
two rows of screws are replaced
10 skylight runs have new screws and washers