Nuralite Overlay

Centre Roof

centre roof looking down slope centre roof looking up slope ponding at gutter end of centre roof view across centre roof to front of building centre roof sprayed with Mosskill a week later, centre roof mopped with Xplus cleaner/degreaser several hours later Xplus has activated to remove grime and dirt several hours later Xplus has activated to remove grime and dirt closeup of the Xplus degreaser sudsing centre roof, has been rinsed off, now being waterblasted centre roof on completion of cleaning, looking towards gutter end centre roof on completion of cleaning, looking towards high end repair patch at end of centre roof removed and double sided adhesive tape being inserted tape inserted and heated  to bring opened lap together 1.5mm polythene/bitumen strips applied over repaired lap centre roof being coated with hydroepoxy primer centre roof ready for new lamination process

Dormer Roofs

one of the dormer roofs another dormer roof two dormer roofs are joined in once corner, a lap is seperating closer view of seperated lap this dormer is heavily mossed another seperated lap the dormers have been treated with Mosskill a week later the moss has been scraped off and disposed of about to waterblast the dormers once dried the laps are repaired a new bitumen strip over the lap repair

L Shaped Roof

area over front entry looking towards street closer view of section over front entry view of same roof looking to the right of previous photo, towards the north closer view of area in previous photo another view back towards front entry section view upslope from north end reverse view from previous photo, ponding at gutter edge L shaped roof being sprayed with Moskill closer view over front entry roof with Mosskill applied Moskill spraying around the corer on the L shaped roof view from higher up Moskill on L shaped roof another small roof at the front heavy Moss the Moskill will be left a week to activate one of three nail pops through the L shape roof one of three nail pops through the L shape roof one of three nail pops through the L shape roof  a week later waterblasying the L shaped roof 1500 psi waterjet the area over the front entry after cleaning closer view of the area over the front entry after cleaning around the corner after cleaning down slope towards the gutter (north) upslope towards the high point a week later on a dry day a week later on a dry day a week later on a dry day, note darker patches over nail pops the dormers are primed with hydroepoxy primer closeup view of a dormer primed with hydroepoxy brush work under metal roof overhang with hydroepoxy primer brush work under metal roof overhang ond over bitumen patches with hydroepoxy primer fibreglass lamination work begins with the dormer edges/turndowns fibreglass lamination work begins with the dormer edges/turndowns closeup of the fibreglass embedded in the waterproofing compound more hydroepoxy priming, on the L shaped roof, view downslope to the north from the high point more hydroepoxy priming, on the L shaped roof, view upslope from the front entry

Advertisements